References

  1. N.M. Wade, R.S. Fletcher, Energy Allocation and Other Factors Influencing Water Costs in Desalination and Dual Purpose Power/Water Plant, Proc. IDA World Congress, Vol. III, 1995, pp. 363–379.
  2. N.M. Wade, Energy and cost allocation in dual purpose power and desalination plants, Desalination, 123 (1999) 115–125.
  3. N.M. Wade, J. Willis, T. McSorley, The Taweelah A2 independent water and power project, Desalination, 123 (1999) 191–202.
  4. A.M. El-Nasher, Cost allocation in a cogeneration plant for the production of power and desalted water – comparison of the exergy cost accounting method with the WEA method, Desalination, 122 (1999) 15–34.
  5. L. Breidenlbath, R. Rautanbaih, G.F. Tusel, Thermoeconomic Assessment of Fossil Fuel Fired Dual Purpose Power Water Plants, IDA World Congress, Madrid, Spain, Vol. 4, 1997, pp. 167–180.
  6. L. Breidenlbath, Thermoeconomic Evaluation of a Nuclear Co-production Plant for Electricity and Potable Water, Proc. An international Symposium on Desalination of Seawater with Nuclear Energy, Taeja, 1997, pp. 181–198.
  7. A.H. Osman, H.A. Al-Washmi, H.A. Al-Otaibi, Thermoeconomic analysis of a power/water cogeneration plant, Energy, 31 (2006) 2699–2709.
  8. A.M. El-Nasher, Optimal design of a cogeneration plant for power and desalination taking equipment reliability into consideration, Desalination, 229 (2008) 21–32.
  9. M.A. Darwish, E.M. Al-Awadhi, A.M. Darwish, Energy and water in Kuwait Part 1. A sustainability view point, Desalination, 225 (2008) 341–355.
  10. R. Borsani, S. Rebagliati, Fundamentals and costing of MSF desalination plants and comparison with other technologies, Desalination, 182 (2005) 29–37.
  11. K.V. Reddy, N. Ghaffour, Overview of the cost of desalinated water and costing methodologies, Desalination, 205 (2007) 340–353.
  12. M.A. Darwish, Desalting fuel energy cost in Kuwait in view of $75/barrel oil price, Desalination, 208 (2007) 306–320.
  13. R.A. Gaggioli, Y.M. El-Sayed, A Critical Review of Second Law Costing Methods, Proc. IV International Symposium on Second Law Analysis of Thermal Systems, (ASME Book 100236), ASME N.Y., USA, 1987, pp. 59–73.
  14. A.M. El-Nasher, Cost allocation of electricity and water in a cogeneration plant. Desalination, 85 (1992) 197–212.
  15. A.M. El-Nasher, Cost allocation of electricity and water for Umm El-Nar cogeneration plant using the exergy accounting method, Desalination, 71 (1989) 57–71.
  16. K.C. Ng, M.W. Shahzad, H.S. Son, O.A. Hamed, An exergy approach to efficiency evaluation of desalination, Appl. Phys. Lett., 110 (2017) 184101.
  17. M.W. Shahzad, M. Burhan, H.S. Son, S.J. Oh, K.C. Ng, Desalination process evaluation at common platform: a universal performance ratio (UPR) method, Appl. Thermal Eng., 134 (2018) 62–67.
  18. M.A. Darwish, F. AlAsfour, N. Al-Najem, Energy consumption in equivalent work by different desalting methods: case study for Kuwait, Desalination, 152 (2003) 83–92.
  19. M.A. Darwish, F.M. Al Awadhi, A.B. Amer, The impact of cogeneration power and desalting plants (CPDP) on the environment in Kuwait, Desal. Wat. Treat., 12 (2009) 185–195.
  20. M.A. Darwish, A. Bin Amer, Cost allocation in cogeneration power–desalination plant utilizing gas/steam combined cycle (GTCC) in Kuwait, Int. J. Exergy, 14 (2014) 275–302.
  21. S. Ihm, O.I. Al-Najdi, O.A. Hamed, G. Jun, H. Chung, Energy cost comparison between MSF and SWRO: case studies for dual purpose plants, Desalination, 397 (2016) 116–125.
  22. O.A. Hamed, Thermoeconomic analysis of combined power cycle integrated with MSF/SWRO desalination plants, Desal. Wat. Treat., 57 (2016) 26552–26561.