References
Achim, D., Ghotb, F., McManus, K. J. (2007). Prediction of Water Pipe Asset Life Using Neural Networks. Journal of Infrastructure System, 26–30.
Ambrose, M., Burn, S., DeSilva, D., Rahilly, M. (2008). LIFE CYCLE ANALYSIS OF WATER NETWORKS. Plastic Pipes Conferences Association. Budapest: Plastic Pipes XIV.
AWWA. (2017). 2017 AWWA Utility Benchmarking Performance Management for Water and Wastewater. Kissimmee: American Water Works Association.
Grigg, N. S., Fontane, D. G., Zyl, J. v. (2013). Water Distribution System Risk Tool for Investment Planning. Denver: Water Research Foundation.
Hamidala, K, F., Sagar, G. Y. (2016). Statistical Analysis of Pipe Breaks in Water Distribution Systems in Ethiopia, the Case of Hawassa. IOSR Journal of Mathematics (IOSR-JM), 127–136.
Moglia, M., Burn, S., Meddings, S. (2005, October). Parms-Priority: a methodology for water pipe replacement. Pipes Wagga Wagga, 17–21.