References

  1. S. Andrew Starbird, The effect of acceptance sampling and risk aversion on the quality delivered by suppliers, J. Oper. Res. Soc., 45 (1994) 309–320.
  2. H. Neil, Dynamic distribution planning techniques: progressive logistics optimization for manufacturers, Logist. Inf. Manage., 9 (1996) 27–35.
  3. X.Q. Li, S.G. Chen, A model of first-pass default probability in the presence of incomplete information about the firm, Chin. J. Appl. Probab. Stat., 33 (2017) 247–256.
  4. X.Y. Huang, Z. Lu, Incentives strategy of quality control in supply chain on asymmetrical information conditions, J. Northeastern Univ., 2003 (2003) 998–1001.
  5. C.H. Zhang, X.Y. Huang, Supply chain quality prevention decision under asymmetric information, Syst. Eng.-Theory Pract., (2003) 95–99 (in Chinese).
  6. C.H. Zhang, X.Y. Huang, Quality evaluation decision in outsourcing under asymmetric information, Chin. J. Manage. Sci., 12 (2004) 46–50 (in Chinese).
  7. C.H. Zhang, X.Y. Huang, Quality evaluation and transfer payment decision in outsourcing under asymmetric information, J. Ind. Eng. Eng. Manage., 18 (2004) 82–86 (in Chinese).
  8. H.Y. Fu, S.K. He, Quality control decision analysis in BT project under asymmetric information, Syst. Eng.-Theory Pract., 8 (2006) 69–75 (in Chinese).
  9. M.H. Jin, Y.W. Wang, C. Zhang, On the quality supervision decision of the construction supply chain under asymmetric information, Chin. J. Manage. Sci., 15 (2007) 449–453 (in Chinese).
  10. B. Wang, H.G. Zhou, Y.T. Jiao, Quality control of water conservancy construction projects under asymmetric information, J. Hydroelectric Eng., 33 (2014) 311–316 (in Chinese).
  11. Z.F. Li, S.Y. Wang, X.T.A. Deng, Liner programming algorithm for optimal portfolio selection with transaction costs, Int. J. Syst. Sci., 31 (2000) 107–117.
  12. W. Wang, Analysis of duopoly game model with quadratic cost function, J. Dongguan Univ. Technol., 27 (2020) 1–4.
  13. Z.X. Wei, X. Wei, Z.C. Zhou, The portfolio selection models with risk preference parameter and different kinds of convex transaction cost function, J. Chongqing Univ. Technol. (Nat. Sci.), 27 (2013) 88–94.
  14. C.F. Wang, J.L. Yang, X. Zhao, A portfolio management model with typical transaction costs and its solution, Syst. Eng.-Theory Pract., 10 (2002) 134–138.
  15. J.H. Wu, Research on Structural Model and Application of Credit Risk Measurement Under Incomplete Information, Shandong University, 2015.
  16. W.X. Zhang, Game Theory and Information Economics, Shanghai People’s Publishing House, Shanghai, 2000, pp. 242–245.
  17. J.F. Nash Jr., Equilibrium points in n-person games, Proc. Natl. Acad. Sci. U.S.A., 36 (1950) 48–49.
  18. P. Chen, Y.H. Wu, Y.C. Jin, Application of game theory in engineering project quality management, J. East China Jiaotong Univ., 4 (2004) 30–33.
  19. H.B. Li, W.L. Yu, Research on the effect of risk-based trust and quality control on the flexible regulation of quality margin, Value Eng., 34 (2016) 53–55.
  20. S. Baiman, P.E. Fischer, M.V. Rajan, Performance measurement and design in supply chains, Manage. Sci., 47 (2001) 173–188.
  21. S. Baiman, P.E. Fischer, M.V. Rajan, Information, contracting, and quality costs, Manage. Sci., 46 (2000) 776–789.
  22. W.Y. Zhang, Game Theory and Information Economics, Shanghai People’s Publishing House, 2000, pp. 242–245.
  23. P. Chen, Y.H. Wu, Y.C. Jin, Application of game theory in the quality management of engineering projects, J. East China Jiaotong Univ., (2004) 30–33.